simek

iso logo

simek

Faciliteies & Location

UNIQUE FACILITY FOR BOLLARD PULL AND WINCH TEST.

Simek A/S is pleased to introduce our bollard, which gives unique conditions for the BP and Winch Tests such as;

-400 tonnes SWL
-100 m depth
-2000 meters range for wire tensioning
-No ship traffic
-Minor wind
-No current
-No tide

The position of the bollard is situated close to the yard on the coast of South West Norway.

If needed we can also arrange for classification society etc. to be present.

If you plan to do a Bollard Pull or Winch Test, please contact us:

Contact:

E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it

 

 Complete list of all Bollard Pulls at Simek

Updated 10.12.12